Destini bags RM45.6mil rail maintenance job
Destini Bhd’s subsidiary M Rail Technics Sdn Bhd secured a RM45.58 million contract to provide Level 1 and Level 2 maintenance for 13 Class 61 Diesel Multiple Units train sets.
Source: Destini Berhad · August 1, 2026 at 10:54 PM · AI-assisted report
Single-source
KUALA LUMPUR, 2 AUGUST 2026 —
Destini Bhd’s subsidiary M Rail Technics Sdn Bhd secured a RM45.58 million contract to provide Level 1 and Level 2 maintenance for 13 Class 61 Diesel Multiple Units train sets.
Market Impact
The 24-month deal runs from Sept 1, 2026 to Aug 31, 2028 and was awarded by Railway Assets Corp, according to a Bursa Malaysia filing.
Destini said the contract completes Railtec’s full-spectrum capability from Level 1 to Level 4 in maintenance, repair and operations.
“This landmark award completes Railtec’s full-spectrum L1 to L4 rail maintenance, repair and operations (MRO) capability, covering the entire railway asset lifecycle,” Destini said.
With Level 1 and Level 2 services added, Railtec now has end-to-end MRO capabilities across all four levels.
The company did not disclose how the award compares with prior contracts or consensus estimates.
Related: Destini Berhad · Railway Assets Corp